  • 第1题:

    The formalization of management's attitude toward risk is called _____ .

    A Decision Theory.

    B Utility Theory.

    C Decision Tree Analysis.

    D Sensitivity Analysis.

    E Probability Analysis.


    正确答案:B

  • 第2题:

    Sensitivity analysis can be used in risk analysis to:

    A Substitute for uncertainty analysis in risk quantification

    B estimate the level of risk aversion adopted by management

    C estimate the effect of change of one project variable on the overall project

    D A and B

    E All of the above.


    正确答案:C

  • 第3题:

    157 Sensitivity analysis can be used in risk analysis to:

    A. Substitute for uncertainty analysis in risk quantification

    B. estimate the level of risk aversion adopted by management

    C. estimate the effect of change of one project variable on the overall project

    D. A and B

    E. All of the above


    正确答案:C

  • 第4题:

    152 The formalization of management's attitude toward risk is called _____ .

    A. Decision Theory.

    B. Utility Theory.

    C. Decision Tree Analysis.

    D. Sensitivity Analysis.

    E. Probability Analysis


    正确答案:B

  • 第5题:

    The( )process ascertains which risks have the potential of affecting the project and documenting the risks’characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring and Control


    正确答案:A
    风险识别(RiskIdentification)是确定何种风险可能会对项目产生影响,并将这些风险的特征形成文档。

  • 第6题:

    ● SWOT analysis is a kind of risk identification method. If the project team chose the SO strategy, they should __(75)__.

    (75)A.make full use of the advantage and catch the opportunity

    B.overcome the weakness and catch the opportunity

    C.make full use of the advantage and reduce the threat

    D.overcome the weakness and reduce the threat


    正确答案:A

  • 第7题:

    SWOT analysis is a kind of risk identification method. If the project team chose the SO strategy, they should()

    A.make full use of the advantage and catch the opportunity
    B.overcome the weakness and catch the opportunity
    C.make full use of the advantage and reduce the threat
    D.overcome the weakness and reduce the threat

    答案:A
    解析:
    SWOT分析是一种风险识别的方法,如果项目团队选择SO战略(优势、机会),他们应该(75)。A.充分利用优势并抓住机会B.克服弱点并抓住机会C.充分利用优势并减少威胁D.克服弱点并减少威胁

  • 第8题:

    The ( ) process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics.

    A.Risk Identification
    B.Quantitative Risk Analysis
    C.Qualitative Risk Analysis
    D.Risk Monitoring anD.Control

    答案:A
    解析:
    项目风险管理主要包括风险管理计划编制、风险识别、定性风险分析、定量风险分析、风险应对计划编制和风险监控。其中,风险识别过程是确定哪些风险可能会对项目产生影响,并将这些风险的特征形成文档。
    A.风险识别 B.定量风险分析 C.定性风险分析 D.风险检测与控制

  • 第9题:

    风险分析(risk analysis)是包含三个部分的一个过程,即()、()、()。


    正确答案:风险评估;风险管理;风险情况交流

  • 第10题:

    Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。

    • A、initiation planning analysis design development implementation operations and maintenance
    • B、project planning, site assessment risk assessment solution selection and acquisition, testing, and operations
    • C、prepare, plan, design, implement operate, and optimize
    • D、analysis, design, deployment testing, implementation, and production
    • E、presales, project planning, development implementation, operations testing, and operations sign- off

    正确答案:C

  • 第11题:

    名词解释题
    Pest Risk Analysis(PRA)

    正确答案: 以生物或其他科学的和经济的依据,确定一种有害生物是否应该限制和加强防治措施力度的评价过程。
    解析: 暂无解析

  • 第12题:

    单选题
    Which of the following is the best reason for the use of an automated risk analysis tool?下列哪个是使用自动化的风险分析工具最好的理由?()
    A

    Automated methodologies require minimal training and knowledge of risk analysis.自动化方法需要最小限度的风险分析知识培训

    B

    Most software tools have user interfaces that are easy to use大部分软件工具有易于使用的用户界面

    C

    Information gathering would be minimized and expedited due to the amount of information built into the tool.由于工具内置了大量的信息,信息收集过程将会缩减和加速

    D

    Much of the data gathere dduring the review cannot be reused for subsequent analysis.在评估期间大部分被收集的数据不能被重用为后续分析


    正确答案: C
    解析: 暂无解析

  • 第13题:

    The Utility Theory _____ .

    A considers risk propensity of the decision maker.

    B attempts to formalize management's risk considerations.

    C works well with decision tree analysis.

    D is considered highly theoretical.

    E All of the above.


    正确答案:B

  • 第14题:

    122 The profitability and technical data studies are provided in report format to owners and funders for acceptance. This type of report, used to solicit funding, is referred to as a(n) _____.

    A. Project feasibility study.

    B. Economic evaluation analysis.

    C. Risk management manual.

    D. Prospectus.

    E. None of the above


    正确答案:D

  • 第15题:

    60 The Utility Theory _____ .

    A. considers risk propensity of the decision maker.

    B. attempts to formalize management's risk considerations.

    C. works well with decision tree analysis.

    D. is considered highly theoretical.

    E. All of the above


    正确答案:B

  • 第16题:

    190 Final risk quantification considers total risk impacts and _____ .

    A. translates the impacts into economic terms for analysis.

    B. concentrates on schedule impacts

    C. may not consider safety and environmental impacts

    D. A and B

    E. A and C


    正确答案:E

  • 第17题:

    The()process analyzes the effect of risk events and assigns a numerical rating to those risks.()A.Risk Identification B.Quantitative Risk AnalysisC.Qualitative Risk Analysis D.Risk Monitoring and Control


    正确答案:B
    定量风险分析过程分析风险事件的影响并对这些影响赋予一个数值化的评价。

  • 第18题:

    A variety of tools is available to help the analyst to discover the users&39; true needs. These tools are grouped into three broad techniques that are based on the degree of change anticipated in the to-be system - Business process( )is used when the basic business Requirements outlined in the system request focus on employing computer technology in some aspect of the business process. Two popular activities used in the technique are( ). Business process( )means that the basic business requirements target moderate changes to the organization&39; s operations. ( )are three popular activities in the technique. Business process( )means changing the current way of doing business and making major changes to take advantage of new ideas and new technology.

    A.automation B.modeling C.improvement D.reengineering A.duration analysis and outcome analysis B.problem analysis and root cause analysis C.technology analysis and activity elimination D.activity-based costing and informal benchmarking A.automation B.modeling C.improvement D.reengineering A.Duration analysis, activity-based costing and informal benchmarking B.Outcome analysis, technology analysis and activity elimination C.Problem analysis, root cause analysis and critical path analysis D.Cost-benefit analysis, schedule analysis and risk analysis A.automation B.modeling C.improvement D.reengineering


    正确答案:A,B,C,A,D

  • 第19题:

    A variety of tools is available to help the analyst to discover the users' true needs.These tools are grouped into three broad techniques that are based on the degree of change anticipated in the to-be system . Business process(71) is used when the basic business Requirements outlined in the system request focus on employing computer technology in some aspect of the business process. Two popular activities used in the technique are(72). Business process(73)means that the basic business requirements target moderate changes to the organization' s operations.

    (74)are three popular activities in the technique. Business process (75)means changing the current way of doing business and making major changes to take advantage of new ideas and new technology.

    A. Duration analysis,activity-baseD.costing anD.informal bench marking
    B.Outcome analysis, technology analysis anD.activity elimination
    C.Problem analysis, root cause analysis anD.critical path analysis
    D.Cost-benefit analysis, schedule analysis anD.risk analysis

    答案:A
    解析:
    可以使用各种工具来帮助分析师发现用户的真实需求。基于在待系统中预期的变化程度可以将这些工具分为三种。在业务需求中强调采用计算机技术,因此而采用了业务流程(71)技术,该技术使用了两种通用的活动分别是(72)。业务流程(73)意味着基本业务需求针对组织运营的适度变化。(74)是该技术的三大活动。业务流程(75)是利用新思路和新技术来改变商业活动方式。(71) A.自动化 B.建模 C.实施 D.重建(72) A.过程分析和结果分析 B.问题分析和根本原因分析 C.技术分析和作业消除 D.基于活动的成本和非正式的标杆分析法(73) A.自动化 B.建模 C.改进 D.重建(74) A. 持续时间分析,基于活动的成本核算和非正式的基准测试 B.结果分析,技术分析和作业消除 C.问题分析和根本原因分析和关键路径分析 D.成本效益分析, 进度分析和风险分析 (75) A.自动化 B.建模 C.实施 D.重建

  • 第20题:

    ( ) Assesses the priority of identified risks using their probability of occurring,the corresponding impact on project objectives if the risks do occur,as well as other factors such as the time frame and risk tolerance of the project constraints of cost,schedule,scope,and quality.

    A.Quantitative Risk Analysis
    B.Qualitative Risk Analysis
    C.Enterprise Environmental Factors
    D.Risk Management Plan

    答案:B
    解析:
    翻译:(71)利用风险发生概率、风险一旦发生对项目产生的影响以及其他因素(如时间框架和项目制约条件,即成本、进度、范围、质量的风险承受度水平),对已识别风险进行优先级的评估。A.定量风险分析 B.定性风险分析 C.企业环境因素 D.风险管理计划

  • 第21题:

    有害生物风险分析(Pest Risk Analysis,PRA)


    正确答案:以生物的或其他科学的和经济的依据,确定一种有害生物是否应该限制和加强防治措施力度的评价过程。包括三个方面:有害生物风险分析的起点、有害生物风险评估、有害生物风险管理。

  • 第22题:

    填空题
    风险分析(risk analysis)是包含三个部分的一个过程,即()、()、()。

    正确答案: 风险评估,风险管理,风险情况交流
    解析: 暂无解析

  • 第23题:

    名词解释题
    有害生物风险分析(Pest Risk Analysis,PRA)

    正确答案: 以生物的或其他科学的和经济的依据,确定一种有害生物是否应该限制和加强防治措施力度的评价过程。包括三个方面:有害生物风险分析的起点、有害生物风险评估、有害生物风险管理。
    解析: 暂无解析