列车技术检查站 train technical inspection station
第1题:
--- What time will the next train leave?
--- ________.
A. Five people
B. At 8.19
C. At the railway station
第2题:
A.I arrived
B.did I get to
C.that I arrived
D.that I reached
第3题:
The train had left( ) Apce hurried to the railway station.
A. after
B. as
C. while
D. when
第4题:
当我到达火车站时火车已经开走了。
The train________ ________when I got to the train station.
第5题:
The Muster List ("Station Bill") of a ship must be signed by the ______.
A.person in charge
B.Coast Guard marine inspection officer
C.company safety director
D.entire crew
第6题:
无解编作业区段站 the district station without marshalling operation for break-up and make-up of train
第7题:
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()
第8题:
pulled
pulled down
pulled on
pulled out
第9题:
第10题:
In; at
On; to
In; in
On; at
第11题:
From Russia With Love featured mainly within a train.
Movie industry started before the train was invented.
Mission: Impossible featured a brutal fight within a train.
Untouchables featured a gunfight in a station.
第12题:
person in charge
Coast Guard marine inspection officer
company safety director
entire crew
第13题:
一What time will the next train leave ?
一 .
A. Five people
B. At 8.19
C. At the railway station
第14题:
A、skin of our teeth
B、the salt of the earth
C、a lion in the way
D、a piece of cake
第15题:
He ran to the railway station and _____the last train.
A、catch
B、catches
C、caught
D、catched
第16题:
The driver______.
A. lived at the tavern
B. was going home after leaving the stranger at the tavern
C. was going away on the train
D. had to go back to the train station after leaving the stranger at the tavern.
50.答案为A 根据短文第一段他们的目的地是客栈,和最后一段司机说她正往家赶,可推断司机住在客栈。
第17题:
列车别疏解 untwine of train
第18题:
列车技术检查站
第19题:
Verification of the expected performance of the new solution.
A document used by IBM manufacturing to build and ship the system solution.
An IBM Quality Assurance Certificate which is supplied to the customer with the system.
A list of actions that are recommended to reduce risk and create a successful implementation.
第20题:
leaves
has left
left
leaving
第21题:
第22题:
On the Ship Station License
On the side of the EPIRB transmitter
In the radio log
On the Certificate of Inspection
第23题: