MMEL(master minimum equipment list)清单是:().
第1题:
编写MEL时,唯一的依据是MMEL。
第2题:
东航机群的MMEL是FAA(美联邦航空局)或JAA(欧州联邦航空局)颁发的().
第3题:
关于无序列表的语法格式正确的是()。
第4题:
MEL与MMEL的区别是()
第5题:
简述主最低设备清单MMEL定义、时间限制要求。
第6题:
下面哪个表述是正确的:
第7题:
最低设备清单(MEL)与主最低设备清单(MMEL)有什么联系:().
第8题:
The Master of the vessel must be on the bridge when the radar is in use
The radar equipment is only required to be used in restricted visibility
The use of a radar excuses a vessel from the need of a look-out
This equipment must be used to obtain early warning of risk of collision
第9题:
meet the applicable standards
be marked as additional equipment
be stowed in a separate area
All of the above
第10题:
one approved flotation cushion for each person on board
one approved life preserver for each person on board and one life ring
one approved inflatable vest for each person on board
lifeboat capacity equal to 1 1/2 times the number of persons on board
第11题:
$(ul).prepend(<li>内容</li>)
$(ul).before(<li>内容</li>)
$(ul).after(<li>内容</li>)
$(ul).append(<li>内容</li>)
第12题:
during a rain storm
in an explosive atmosphere
near a lifeboat station
by other than senior rig personnel
第13题:
Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()
第14题:
MEL,CDL,MMEL的关系是:().
第15题:
有序列表语法格式正确的是()。
第16题:
在ul中插入一个子元素li,位置不限,以下书写正确的是()。
第17题:
关于手册的缩写解释错误的是:()
第18题:
MEL、CDL、MMEL的关系是()
第19题:
terminal operator
owner of the barge
tankerman or person in charge of loading
charterer through the Master of the towing vessel
第20题:
On the Certificate of Inspection
On the station bill
In the Operations Manual
In either the official or unofficial log
第21题:
a curve of minimum operational metacentric height(GM)versus draught
instructions concerning the operation of cross-flooding arrangements
the signals or lights being exhibited or sounded
all other data and aids which might be necessary to maintain stability after damage
第22题:
elapsed time since the target start date or completion date of previous work generated by PM
difference between completion date of previous work and system date is equal to Lead Time
elapsed time since the target start date or completion date of the latest work orders for the asset
metered equipment usage since the target start date or completion date of previous work generated by PM
metered equipment usage since the target start date or completion date of the latest work order for the asset
第23题:
meet the applicable standards
be marked as additional equipment
be stowed in a separate area
All of the above