参考答案和解析
正确答案:E
更多“Which cell plan is designed first and is the basis for future planning?()A、FinalB、PQreliminaryC、CoverageD、InitialE、Nominal”相关问题
  • 第1题:

    Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings(环境)near shops and bus stops, not too far from your friends and the place where you work.

    Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets.The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate(预算)must be corrected and revised(修订). His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.

    When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high!) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.

    21. The best title of this passage is().

    A. Building a House Costs Much Money

    B. Estimate Is Important

    C. Planning a House

    22. The first thing for a person to build a house is().

    A. to get as much money as possible

    B. to find a suitable piece of land

    C. to work out a plan

    23. The phrase”draw a plan”in this passage means().

    A. making a picture of a building or a room

    B. making a plan

    C. working out a plan

    24. When the builder starts to build a house, his estimate will have to be corrected and revised because().

    A. it is wrongly worked out by a workman

    B. the future owner of the house thinks the estimate is so high that he cannot afford the building

    C. the prices of building materials and the expenses(费用)of labor may be different from the original prices and expenses

    25. What is the relationship(关系)between the estimate and the plan?

    A. The plan depends on the estimate.

    B. The plan has nothing to do with the estimate.

    C. The estimate and the plan depend on each other.


    21.

    答案:C

    解析:文章主要围绕建房子的顺序步骤:选土地、找建筑师、做预算等来展开的,故“Planning a House”符合题意。A、B两项概括不全面,只是文章内容的一部分。

    22.

    答案:B

    解析:根据文中“Your first step will be to find a right piece of land.”可知,建房子的第一件事是要找到一块合适的土地。故选B。

    23.

    答案:A

    解析:根据“draw a plan”后面的“It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets.”可知,建筑师绘制的平面图具体包括房间的数量、位置、尺寸以及窗户、门、电插座等。故A项符合题意。

    24.

    答案:C

    解析:根据文中“His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.”可知,预算是建立在现有价格上的,但是这些价格可能会变,而且在建筑师作出预算和建造房子之间可能会发生许多其他事情,故C项正确。

    25.

    答案:C

    解析:根据文章最后一句“The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.”可知,预算与计划是相互依赖的。故C项正确。

  • 第2题:

    The concept of a"smart city"_________in the Government Work Report for the first time this year, which shows the future direction of China's urban construction.

    A.appeared
    B.was appearing
    C.had appeared
    D.would appear

    答案:A
    解析:
    考查动词时态。主句中提及的事情发生在过去,意在表达在今年过去的某个时间,“智能城市”的概念出现在了《政府工作报告》上,应用过去时。句意为“‘智能城市’的概念今年第一次出现在《政府工作报告》上,表明了未来中国城市建设的方向”。故选A。

  • 第3题:

    资料:Workforce planning helps an organization to estimate its future workforce requirements and calculate the numbers, nature and sources of potential employees who might meet that demand.
    Effective workforce planning helps companies identify and plan how to tackle their current and future workforce challenges and priorities. It provides a sound basis for developing an effective workforce strategy.
    An easy way of thinking about workforce planning it to get the right number of people, with the right skills, in the right place, at the right time. For our company, the right people will be those with relevant skills and capabilities to drive the company forward this year, next year and future years. Our company then provides training and development opportunities that enable people to enhance their skill sets and build their careers. This gives the company the continued benefit of experienced,committed and well-trained employees.
    Like other established companies,we may have a large number of long-standing employees with vast skills and experience. However, as people retire, it needs to replace those skills. Careful monitoring is essential to examine the age and skills profile of the workforce when compared with present and future company needs. This ensures the business can meet its objective.

    Who may be the potential employees of the company?

    A.those who have many work experiences.
    B.those who are likely to quit in a year.
    C.those who are friendly to colleagues.
    D.those who are skilled as well as committed.

    答案:D
    解析:
    本题考查的是细节理解。
    【关键词】who potential employees
    【主题句】第3自然段For our company, the right people will be those with relevant skills and capabilities to drive the company forward this year, next year and future years. 对于我们公司来说,合适的人选将是那些具有相关技能和能力的人,以推动公司在今年、明年和未来几年前进。
    【解析】本题的问题是“谁可能成为公司的潜在员工?”。选项A意为“有许多工作经验的人”;选项B意为“一年中可能退出的人”;选项C意为“对同事们友善的人”;选项D意为“那些技术熟练而又坚定的人”。根据主题句可知,有技能和尽心尽力的人是潜在员工的标准,故选D。

  • 第4题:

    Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations. Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()

    • A、IBMeConfig
    • B、IBM Performance Monitor
    • C、IBM Workload Estimator (WLE)
    • D、IBM System Planning Tool (SPT)

    正确答案:D

  • 第5题:

    Quality planning tools are often used to help plan effective quality management activities.( ) is one of such tools,which involves company actual or planned project practices to those or other projects to generate ideas for improvementand to provide a basis by which to measure performance.

    • A、Benchmarking
    • B、Quality metric
    • C、Quality checklist
    • D、Brainstorming

    正确答案:A

  • 第6题:

    Which of the following should be done FIRST when troubleshooting a problem?()

    • A、Test the theory to determine the cause
    • B、Perform a root cause analysis
    • C、Establish a plan of action
    • D、Document outcomes

    正确答案:A

  • 第7题:

    What will cause wireless voice devices to perform poorly?()

    • A、average signal strength that is greater than -67 dBi
    • B、cell overlap of 15 to 20 percent
    • C、uneven wireless coverage
    • D、absence of coverage holes

    正确答案:C

  • 第8题:

    Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。

    • A、initiation planning analysis design development implementation operations and maintenance
    • B、project planning, site assessment risk assessment solution selection and acquisition, testing, and operations
    • C、prepare, plan, design, implement operate, and optimize
    • D、analysis, design, deployment testing, implementation, and production
    • E、presales, project planning, development implementation, operations testing, and operations sign- off

    正确答案:C

  • 第9题:

    An administrator is planning to bring a newly purchased server online. Which of the following should the administrator do FIRST?()

    • A、Follow the pre-installation plan and procedures.
    • B、Review the system logs to check for errors.
    • C、Notify all users that the old system will be taken offline.
    • D、Apply all security updates to the system.

    正确答案:A

  • 第10题:

    You are a professional level SQL Server 2005 database administrator in an international corporation named Wiikigo. You are experienced in implementing high-availability solutions, monitoring the database server, and design deployment. In the company, you major job is the deployment, maintenance and support of Microsoft SQL Server 2005. You work as a database administrator for your company. There is a user in the Windows SalesManagers group, and he is called Simon. A Reporting Services report is required by Simon to have annual sales information displayed by territory. There is another user in the Windows Sales group, and he is called Jack. He is responsible to report to Simon. A report is required by Jack, and the report is limited to his sales territory, but the same detailed sales data is still displayed, and the detailed sales data is on Simon’s report. A secure solution should be designed to meet the requirements of the users listed above, and the least amount of server resources should be utilized.  Which action should be performed?()

    • A、First, all territory information should be contained by a parameterized report which is designed for Simon. Second, a linked report that links to Simons report should be designed for Jack.
    • B、First, two data regions should be contained by a report which is designed for Simon. Second, one data region should be utilized for summary sales data. Third, the other data region should be utilized for the detailed sales data for each sales representative. Four, a report that displays the detailed sales data should be designed for Jack.
    • C、First, two reports should be designed for Simon. Second, the territory information should be contained by one, and the detailed sales data should be contained by another. At last, a report that displays the detailed sales data for Jack’s territories should be designed for Jack.
    • D、First, the territory information should be contained by a report which is designed for Simon. Second, a report which detailed sales data for Jack’s territories is contained should be designed for Jack. Third, Simon’s report should be set to have the data in Jacks report contained.

    正确答案:A

  • 第11题:

    多选题
    Which two service components are in the plan phase?()
    A

    Proof of Concept

    B

    Site Readiness Assessment

    C

    Proposal Development

    D

    Operations Readiness Assessment

    E

    Account planning


    正确答案: C,A
    解析: 暂无解析

  • 第12题:

    单选题
    Which of the following statements about lesson plan is NOT true?
    A

    A clear lesson plan makes a teacher aware of the aims and language contents of the lesson.

    B

    A lesson plan can help a teacher distinguish the various stages of a lesson.

    C

    A good lesson plan gives a teacher, especially a novice teacher, confidence in class.

    D

    Experienced teachers do not need to do lesson planning.


    正确答案: D
    解析:

  • 第13题:

    View the Exhibit exhibit1 to examine the series of SQL commands. View the Exhibit exhibit2 to examine the plans available in the SQL plan baseline. The baseline in the first row of the Exhibit is created when OPTIMIZER_MODE was set to FIRST_ROWS.Which statement is true if the SQL query in exhibit1 is executed again when the valueof OPTIMIZER_MODE is set to FIRST_ROWS?()

    A. The optimizer uses a new plan because none of the plans in the exhibit2 are fixed plans.

    B. The optimizer uses the plan in the second row of the exhibit2 because it is an accepted plan.

    C. The optimizer uses the plan in the first row of the exhibit2 because it is the latest generated plan.

    D. The optimizer uses the plan in the first row of the exhibit2 because OPTIMIZER_MODE was set to FIRST_ROW during its creation.


    参考答案:B

  • 第14题:

    资料:Workforce planning helps an organization to estimate its future workforce requirements and calculate the numbers, nature and sources of potential employees who might meet that demand.
    Effective workforce planning helps companies identify and plan how to tackle their current and future workforce challenges and priorities. It provides a sound basis for developing an effective workforce strategy.
    An easy way of thinking about workforce planning it to get the right number of people, with the right skills, in the right place, at the right time. For our company, the right people will be those with relevant skills and capabilities to drive the company forward this year, next year and future years. Our company then provides training and development opportunities that enable people to enhance their skill sets and build their careers. This gives the company the continued benefit of experienced,committed and well-trained employees.
    Like other established companies,we may have a large number of long-standing employees with vast skills and experience. However, as people retire, it needs to replace those skills. Careful monitoring is essential to examine the age and skills profile of the workforce when compared with present and future company needs. This ensures the business can meet its objective.

    Why is workforce planning so essential?

    A.because it enables the company to know its employees better.
    B.because it makes the company prepared for the potential challenges.
    C.because it gives the employees a chance to receive training
    D.all above

    答案:A
    解析:
    本题考查的是细节理解。
    【关键词】why workforce planning; essential
    【主题句】第1自然段Workforce planning helps an organization to estimate its future workforce requirements and calculate the numbers, nature and sources of potential employees who might meet that demand. 劳动力规划有助于组织估计其未来的劳动力需求,并计算出可能满足这种需求的潜在雇员的数量、性质和来源。
    【解析】本题的问题是“为什么劳动力规划如此重要?”。选项A意为“因为它可以让公司更好地了解员工”;选项B意为“因为它使公司为潜在的挑战做好准备”;选项C意为“因为它给员工一个接受培训的机会”;选项D意为“上述所有”根据主题句可知,因为它可以使公司更了解雇员,故选A。

  • 第15题:

    Quality planning tools are often used to help plan effective quality management activities. ( ) is one of such tools,which involves comparing actual or planned project practices to other projects to generate ideas for improvement and to provide a basis by which to measure performance.

    A.Benchmarking
    B.Quality metric
    C.Quality checklist
    D.Brainstorming

    答案:A
    解析:
    质量规划工具通常用来帮助计划有效的质量管理活动。(71)是一个这样的工具,它通过与别的项目比较实际的或计划的项目活动,产生改进的建议,并且提供一个基准用来衡量业绩的依据。A.基准 B.质量度量 C.质量检查表 D.头脑风暴

  • 第16题:

    Which of the following best describe the customer benefit of creating a systems acceptance test plan in the design phase?()

    • A、Reduce unnecessary disruption, delay,rework, and other problems by establishing test cases for use in verifying that the systems meets operational, functional, and interface requirements
    • B、Improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy
    • C、Reduce operating costs and limit charge-related incidents by providing a consistent and efficient set of processes
    • D、Improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps in early in the planning process to determine whet is needed to support the systems

    正确答案:A

  • 第17题:

    Quality planning tools are often used to help plan effective quality management activities . ()is one of such tools, which involves company actual or planned project practices to those or other projects to generate ideas for improvement and to provide a basis by which to measure performance.

    • A、Benchmarking
    • B、Quality metric
    • C、Quality checklist
    • D、Brainstornung

    正确答案:A

  • 第18题:

    An administrator is creating a business continuity plan.  Which of the following would be done FIRST in order to develop this plan?()

    • A、Setup replication on all SANs
    • B、Classify systems
    • C、Locate an offsite facility for failover
    • D、Create an architecture plan for all systems

    正确答案:B

  • 第19题:

    Which two service components are in the plan phase?()

    • A、Proof of Concept
    • B、Site Readiness Assessment
    • C、Proposal Development
    • D、Operations Readiness Assessment
    • E、Account planning

    正确答案:B,D

  • 第20题:

    Which is the MOST effective method for generating support for your project plan?()

    • A、Requiring stakeholders to sign-off on project plan components
    • B、Requesting input from all stakeholders during the planning process
    • C、Providing an open line of communication regarding the project
    • D、Clearly illustrating how the project relates to the company’s objectives

    正确答案:B

  • 第21题:

    An administrator is planning to bring a newly purchased server online. Which of the following should the administrator do FIRST?()

    • A、 Follow the pre-installation plan and procedures.按照预先安装计划和程序。
    • B、 Review the system logs to check for errors.
    • C、 Notify all users that the old system will be taken offline.
    • D、 Apply all security updates to the system.

    正确答案:A

  • 第22题:

    单选题
    An administrator is planning to bring a newly purchased server online. Which of the following should the administrator do FIRST?()
    A

     Follow the pre-installation plan and procedures.按照预先安装计划和程序。

    B

     Review the system logs to check for errors.

    C

     Notify all users that the old system will be taken offline.

    D

     Apply all security updates to the system.


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。
    A

    initiation planning analysis design development implementation operations and maintenance

    B

    project planning, site assessment risk assessment solution selection and acquisition, testing, and operations

    C

    prepare, plan, design, implement operate, and optimize

    D

    analysis, design, deployment testing, implementation, and production

    E

    presales, project planning, development implementation, operations testing, and operations sign- off


    正确答案: D
    解析: 暂无解析