更多“()(高速)operation and rough handling of covers are dangerous.A、High-speedB、Low-speedC、Slow-speedD、Quick-speed”相关问题
  • 第1题:

    The primary reason for placing covers over storage batteries is to ______.

    A.Prevent the accumulation of explosive gases

    B.Protect the hull from leaking electrolyte

    C.Prevent movement of the battery in rough waters

    D.Protect against accidental shorting across terminals


    正确答案:D

  • 第2题:

    ______ is not a proper instruction for handling hatch covers.

    A.not to obstruct clear fore-and-aft passageways

    B.not to obstruct coaming-to-bulwark passageways

    C.to be lashed or otherwise secured to prevent accidental dislodgement

    D.to be laid on their sides


    正确答案:D

  • 第3题:

    从每小题的四个选择项中,选出最佳的一项,并把它前面的大写字母填入左边的括弧里。
    —The sea is very rough today.
    —Yes,I‘ve never seen_______before.

    A.such rough sea
    B.such a rough sea
    C.so rough sea
    D.that rough sea

    答案:B
    解析:

  • 第4题:

    高速和野蛮操作舱盖均是危险的。()

    • A、High-speed operation and rough handling of hatches are dangerous.
    • B、Low-speed operation and rough handling of hatches are dangerous.
    • C、Low-speed operation and rough handling of hatch covers are dangerous.
    • D、High-speed operation and rough handling of hatch covers are dangerous.

    正确答案:D

  • 第5题:

    我船配有自动舱盖。()

    • A、Our ship is equipped with automatic hatch covers.
    • B、Our ship is equipped with folding-type hatch covers.
    • C、Our ship is equipped with side-rolling hatch covers.
    • D、Our ship is equipped with rolling-type hatch covers.

    正确答案:A

  • 第6题:

    ()is the most frequent activities in the logistics, but generally adds no value to a product, those operation should be kept to a minimum.

    • A、Transportation
    • B、Handling and carrying
    • C、Marketing forecasts

    正确答案:B

  • 第7题:

    单选题
    High-speed operation and rough handling of covers are dangerous.()
    A

    高速操作和野蛮开关舱是危险的

    B

    高速和野蛮操作舱盖是危险的

    C

    低速操作和野蛮开关舱是危险的

    D

    低速和野蛮操作舱盖是危险的


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    Which statement(s) is/are TRUE concerning crane cargo operations? ()
    A

    Do not exceed rated load capacity of crane and container spreader or slings

    B

    During any cargo handling operation,the safety of personnel is paramount

    C

    Cargo handlers must be outfitted with adequate protection from personal injury

    D

    All the above


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    ()(高速)operation and rough handling of covers are dangerous.
    A

    High-speed

    B

    Low-speed

    C

    Slow-speed

    D

    Quick-speed


    正确答案: A
    解析: 暂无解析

  • 第10题:

    问答题
    Practice 1  ● Your company ordered from Maximum Company 50 tables. But when the goods arrived, you found that the sides of nearly all the tables are badly scratched. The damage appears to have been caused by rough handling before dispatch.  ● You are asked to write to Mr. Cooper, sales manager of Maximum, and complain about the damage.  ● Write about 60—80 words.

    正确答案: 【参考范文】
    Dear Mr. Cooper,
    We duly received the 50 tables from you, but regret to tell you that we find that the sides of nearly all the tables are badly scratched.
    It seems that the damage has been caused by rough handling before the dispatch, so we would appreciate it if you could inform us of what measures you are about to take as for the compensation for the damage as soon as possible.
    We look forward to hearing from you soon.
    Yours sincerely,
    Signature
    解析: 暂无解析

  • 第11题:

    单选题
    When ship navigating in rough sea, the correct operation is ()
    A

    navigating with a low diesel engine speed

    B

    navigating with a stable diesel engine speed

    C

    increasing the efficiency of propeller

    D

    increasing fuel injection


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    These include deck machinery such as mooring equipment, anchor handling equipment, cranes and ().
    A

    boilers

    B

    bow thrusters

    C

    stabilizers

    D

    hatch covers


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Direct delivery and discharge can ______ the handling operation.

    A.Speed down

    B.Quick

    C.Slow down

    D.Facilitate


    正确答案:D

  • 第14题:

    —The sea is very rough today.
    —Yes,I‘ve never seen_______before.

    A.such rough sea
    B.such a rough sea
    C.so rough sea
    D.that rough sea

    答案:B
    解析:

  • 第15题:

    ()-speed operation and rough handling of covers are dangerous.

    • A、Low
    • B、High
    • C、Slow
    • D、Quick

    正确答案:B

  • 第16题:

    High-speed operation and rough handling of covers are dangerous.()

    • A、高速操作和野蛮开关舱是危险的
    • B、高速和野蛮操作舱盖是危险的
    • C、低速操作和野蛮开关舱是危险的
    • D、低速和野蛮操作舱盖是危险的

    正确答案:A

  • 第17题:

    装卸货之前,打开舱盖。()

    • A、After loading and discharging, hatch covers will be opened.
    • B、After loading and discharging, hatch covers will be closed.
    • C、Before loading and discharging, hatch covers will be opened.
    • D、Before loading and discharging, hatch covers will be closed.

    正确答案:C

  • 第18题:

    ()are used widely in the operation of warehouse and distribution center andform the basic handling device for a number of selection system.

    • A、Cranes
    • B、Conveyors
    • C、Forklifttruck
    • D、Pallets

    正确答案:B

  • 第19题:

    单选题
    高速和野蛮操作舱盖均是危险的。()
    A

    High-speed operation and rough handling of hatches are dangerous.

    B

    Low-speed operation and rough handling of hatches are dangerous.

    C

    Low-speed operation and rough handling of hatch covers are dangerous.

    D

    High-speed operation and rough handling of hatch covers are dangerous.


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    Direct delivery and discharge can()the handling operation.
    A

    speed down

    B

    quick

    C

    slow down

    D

    facilitate


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    If a diesel engine has been stopped because of piston seizure due to severe overheating, the crankcase()
    A

    inspection covers should not be opened until the engine has cooled

    B

    ventilation system should be continued in operation for one hour for cooling

    C

    scavenge pump should be immediately secured to prevent loss of lube oil

    D

    explosion covers should be opened slightly to provide extra ventilation


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    ()-speed operation and rough handling of covers are dangerous.
    A

    Low

    B

    High

    C

    Slow

    D

    Quick


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    The primary reason for placing covers over storage batteries is to().
    A

    Prevent the accumulation of explosive gases

    B

    Protect the hull from leaking electrolyte

    C

    Prevent movement of the battery in rough waters

    D

    Protect against accidental shorting across terminals


    正确答案: C
    解析: 暂无解析