Before the()of the derrick, check all the tackle closely.A、operationB、operateC、operatedD、operator

题目

Before the()of the derrick, check all the tackle closely.

  • A、operation
  • B、operate
  • C、operated
  • D、operator

相似考题
更多“Before the()of the derrick, chec”相关问题
  • 第1题:

    把吊杆甩向码头。()

    • A、Please swing the derrick to wharf side.
    • B、Just go down the derrick , please.
    • C、Just a moment , please.
    • D、Please swing the derrick to inboard.

    正确答案:A

  • 第2题:

    Do you want the derrick adjusted upwards or downwards? ()

    • A、Top the derrick.
    • B、Yes, I do.
    • C、No, I don’t.
    • D、Sorry, I don’t know.

    正确答案:A

  • 第3题:

    The ()(吊杆托架) supports the derrick.

    • A、derrick boom rest
    • B、derrick head
    • C、derrick mast
    • D、derrick guy

    正确答案:A

  • 第4题:

    智利的国家代码是()。

    • A、CHL
    • B、CHE
    • C、CHI

    正确答案:A

  • 第5题:

    重吊杆用于吊大的重件。()

    • A、Heavy derrick is used for lifting large heavy cargo.
    • B、Derrick is used for lifting large heavy cargo.
    • C、Heavy derrick is used for lifting dry bulk cargo.
    • D、Derrick is used for lifting dry bulk cargo.

    正确答案:A

  • 第6题:

    心脏中含量最多的酶是()

    • A、AST
    • B、CHE
    • C、LCAT
    • D、LPL
    • E、铜氧化酶

    正确答案:A

  • 第7题:

    单选题
    The net productivity per gang-hour can be improved through a decrease of().
    A

    Cranes/derricks

    B

    Crane/derrick cycles

    C

    Crane/derrick cycle time

    D

    Weight per package


    正确答案: B
    解析: 暂无解析

  • 第8题:

    问答题
    试述CHEC系统中功率斜坡单元的功能。

    正确答案: 功率斜坡电路的作用是使机车在提升功率时按一定速率上升以改善机车起动及运行性能ND5机车功率斜坡曲线有两种形式,一种为二斜率形式,另一种为三斜率形式。
    解析: 暂无解析

  • 第9题:

    单选题
    请调高一下吊杆。()
    A

    Lower the derrick, please.

    B

    Top the derrick, please.

    C

    Swing the derrick, please.

    D

    Adjust the derrick, please.


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    There is no power for the ().
    A

    derrick

    B

    winch

    C

    block

    D

    heavy derrick


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    Before the operation of the derrick, check all ()(索具)closely and everything must be in good condition.
    A

    blocks

    B

    goosenecks

    C

    tackle

    D

    guys


    正确答案: A
    解析: 暂无解析

  • 第12题:

    请修理一下受损吊杆。()

    • A、Please have the damaged derrick readjusted.
    • B、Please have the damaged derrick repaired.
    • C、Please have the damaged derrick painted.
    • D、Please have the damaged derrick brushed.

    正确答案:B

  • 第13题:

    请把吊杆甩到舱口上方好吗?()

    • A、Will you please swing the heavy derrick over the hatch?
    • B、Will you please swing the derrick over the hatch?
    • C、Will you please lower the derrick over the hatch?
    • D、Will you please top the heavy derrick over the hatch?

    正确答案:B

  • 第14题:

    “吴楚东南坼”的“坼”字,正确的读音为()

    • A、chi
    • B、che
    • C、ci
    • D、ce

    正确答案:B

  • 第15题:

    This ()was repaired in Singapore.

    • A、damaged derrick
    • B、damaging derrick
    • C、derrick to be damaged
    • D、derrick

    正确答案:A

  • 第16题:

    这个吊杆的安全工作负荷是6吨。()

    • A、The SWL of the derrick is five tons.
    • B、The SWL of the heavy derrick is six tons.
    • C、The SWL of the derrick is six tons.
    • D、The SWL of the crane is six tons.

    正确答案:C

  • 第17题:

    单选题
    这个吊杆的安全工作负荷是6吨。()
    A

    The SWL of the derrick is five tons.

    B

    The SWL of the heavy derrick is six tons.

    C

    The SWL of the derrick is six tons.

    D

    The SWL of the crane is six tons.


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().
    A

    dock

    B

    hold

    C

    pedestal

    D

    machinery space


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    Do you want the derrick adjusted upwards or downwards? ()
    A

    Top the derrick.

    B

    Yes, I do.

    C

    No, I don’t.

    D

    Sorry, I don’t know.


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A warp end may be fitted for operating the derrick topping wire which adjusts the derrick ().
    A

    length

    B

    slack

    C

    height

    D

    rotation direction


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    () may be fitted for operating the derrick topping lift (the wire which adjusts the derrick height).
    A

    A capstan

    B

    A hold

    C

    A warp end

    D

    A mooring drum


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    Before the()of the derrick, check all the tackle closely.
    A

    operation

    B

    operate

    C

    operated

    D

    operator


    正确答案: B
    解析: 暂无解析