更多“()are for radiators and pipes an”相关问题
  • 第1题:

    ()(耐热漆) are for radiators and pipes and for the ship’s funnel.

    • A、Varnish
    • B、Anti-corrosive paints
    • C、Heat-resistant paints
    • D、Anti-fouling paint

    正确答案:C

  • 第2题:

    You are preparing for a new installation of SQL Server 2005. You need to select the protocols that client computers might use to connect to the server. Which two protocols can you use to achieve this goal?()

    • A、 Named Pipes 
    • B、 TCP/IP 
    • C、 Shared Memory 
    • D、 Virtual Interface Adapter (VIA) 
    • E、 Multiprotocol 

    正确答案:A,B

  • 第3题:

    名词解释题
    管道防腐(corrosion preventive of pipes)

    正确答案: 为减缓或防止管道在内外介质的化学、电化学作用下或由微生物的代谢活动而被侵蚀和变质的措施。
    解析: 暂无解析

  • 第4题:

    单选题
    ()are for radiators and pipes and for the ship’s funnel.
    A

    Varnishes

    B

    Anti-corrosive paints

    C

    Heat-resistant paints

    D

    Primer


    正确答案: C
    解析: 暂无解析

  • 第5题:

    单选题
    Telescopic pipes to the piston of a large slow-speed main propulsion diesel engine are designed to prevent ().
    A

    excessive crankcase pressure

    B

    excessive lube oil temperature

    C

    contamination of the lube oil by water

    D

    contamination of the cooling water by lube oil


    正确答案: C
    解析: 暂无解析

  • 第6题:

    单选题
    Pipes made of plastic are now widely used in building as they are light and do not become ()in water.
    A

    ripe

    B

    instant

    C

    rotten

    D

    mature


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    Large pipes or () are fitted between the steam and water drums to ensure good natural circulation of water.
    A

    fire-tubes

    B

    furnaces

    C

    down-comers

    D

    soot-blowers


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    Emulsion oils and sodium nitrite are both approved additives, but the latter cannot be used if any pipes are () or if any soldered joints exit.
    A

    chromed

    B

    welded

    C

    galvanized

    D

    bolted


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    Main steam and exhaust pipes for winches and similar gear shall not pass through crew accommodation nor, whenever technically possible, through alleyways leading to crew accommodation; where they do pass through such alleyways, they shall be adequately ().
    A

    ventilated and tagged

    B

    ventilated and cooled down

    C

    insulated and encased

    D

    insulated and warmed up


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()
    A

    excess amount of oily-water mixtures in bilges

    B

    insulation of piping including exhaust pipes in engine room contaminated by oil

    C

    improper operation of bilge pumping arrangements

    D

    there were an actual emergency


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    Large pipes or down-comers are fitted between the steam drum and () to ensure good natural circulation of water.
    A

    fire-tubes

    B

    furnaces

    C

    water drums

    D

    water wall tubes


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    ()is not a step for anchoring preparation.
    A

    To take off the covers from the hawse pipes and clear the spurling pipes

    B

    To make sure that the windlass is out of gear and the brakes are on

    C

    To turn the windlass over slowly

    D

    To inform the engine room to ensure that deck power and water are off


    正确答案: C
    解析: 暂无解析

  • 第13题:

    管道防腐(corrosion preventive of pipes)


    正确答案: 为减缓或防止管道在内外介质的化学、电化学作用下或由微生物的代谢活动而被侵蚀和变质的措施。

  • 第14题:

    单选题
    ()(耐热漆) are for radiators and pipes and for the ship’s funnel.
    A

    Varnish

    B

    Anti-corrosive paints

    C

    Heat-resistant paints

    D

    Anti-fouling paint


    正确答案: C
    解析: 暂无解析

  • 第15题:

    单选题
    The lubricating pipes and dusts should be blown out with ().
    A

    atmosphere

    B

    the fresh water

    C

    compressed air

    D

    chemical compounds


    正确答案: B
    解析: 暂无解析

  • 第16题:

    单选题
    All items such as steam pipes, exhaust pipes and fittings which, because of their location and operating temperature, present a hazard should be adequately lagged.That means the items should()
    A

    not be put into operation too early

    B

    be pay adequate attention to

    C

    be used only when necessary

    D

    be coated with certain material


    正确答案: B
    解析: 暂无解析

  • 第17题:

    单选题
    One characteristic of a pulse type turbo-charging system is()
    A

    high average exhaust manifold

    B

    greatly fluctuating inlet manifold pressure

    C

    constant exhaust manifold pressure

    D

    multiple exhaust pipes to the turbocharger


    正确答案: C
    解析: 暂无解析

  • 第18题:

    单选题
    () provide the water to the pistons.
    A

    Pneumatic pipes

    B

    Hydraulic pipes

    C

    Telescopic pipes

    D

    Operating gas pipes


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    Exhaust pipes for separate diesel engines can be combined only when ()
    A

    space limitations prevent separately run pipes

    B

    the engines are small auxiliary units

    C

    they are arranged to prevent gas backflow to each engine

    D

    a waste heat boiler is installed


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    Emulsion oils and sodium nitrite are both approved additives, but () cannot be used if any pipes are galvanized or if soldered joints exist.
    A

    the latter

    B

    latter

    C

    former

    D

    the former


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()
    A

    failure of the proper operation of the main steering gear

    B

    failure of the proper operation of electrical installations

    C

    leakage of domestic water pump

    D

    insulation of exhaust pipes in engine room contaminated by oil


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    What should you set the Client Configuration to when configuring the ODBC Data Source for the Database Subsystem?()
    A

    TCP/IP  

    B

    Multiprotocol  

    C

    Named Pipes  

    D

    NWLink IPX/SPX


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    It is usual to identify the fluids in pipes by bands of paint at intervals, and the engineer should familiarize himself with the code in use.According to the above sentence, which of the following statements is true?()
    A

    People can know the types of fluids in pipes by feeling with hands

    B

    There are series of rings painted in the pipes to show various fluids

    C

    Engineers should wear cards standing for ranks

    D

    Engineer knows his own code very well


    正确答案: B
    解析: 暂无解析