更多“This cargo runner is too short. Please ()it for a long one.A、chargeB、changeC、dischargeD、repair”相关问题
  • 第1题:

    It’s high time you had your hair cut ; it’s getting_______ .

    A. too much long B. much too long C. long too much D. too long much


    正确答案:B

  • 第2题:

    When carrying a cargo of asphalt or molten sulfur,which are carried at temperatures of over 300°F,one of the biggest dangers is ______.

    A.water in the tanks or pipelines

    B.having the cargo too cool

    C.explosion of vapors after discharge

    D.inadequate ullage space


    正确答案:A

  • 第3题:

    Please telephone me half an hour_______.

    A.in charge
    B.in advance
    C.in time
    D.in front

    答案:B
    解析:

  • 第4题:

    Please fix some()(货灯).

    • A、hold lights
    • B、cargo lights
    • C、cargo lanterns
    • D、hatch lamps

    正确答案:B

  • 第5题:

    A ()is at the end of the cargo runner for picking up the load.

    • A、sling
    • B、hook
    • C、block
    • D、tackle

    正确答案:A

  • 第6题:

    液体散货用泵装卸的。()

    • A、Liquid cargo is loaded and discharged by pumps.
    • B、Liquid cargo is loaded and discharged by tubes.
    • C、Liquid bulk cargo is loaded and discharged by tubes.
    • D、Liquid bulk cargo is loaded and discharged by pumps.

    正确答案:D

  • 第7题:

    Renew a cargo runner, please. ()

    • A、fall
    • B、stay
    • C、guy
    • D、sling

    正确答案:A

  • 第8题:

    At each drill a different person should be in ()(负责)of an extinguisher.

    • A、charge
    • B、load
    • C、discharge
    • D、handle

    正确答案:A

  • 第9题:

    单选题
    For a given weight of cargo,the stress on the heel block of a cargo boom().
    A

    increases as the cargo closes the head while hoisting

    B

    increases if the cargo runner is doubled up

    C

    decreases as the boom is topped to a greater angle

    D

    is determined by the thrust stresses on the boom


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    ()cargo means to check all cargo loaded into or discharged from a vessel.
    A

    Tallying

    B

    Examining

    C

    Weighing

    D

    Handling


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Overcarriage is best prevented by().
    A

    assuring heavy cargo is stowed low in the vessel

    B

    checking the vessel's load line calculations carefully

    C

    inspection of the hold at completion of discharge

    D

    stowing the cargo which is to be discharged last on the bottom


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    Crude oil washing of cargo tanks has the following advantages except for ()
    A

    reducing the erosion of the cargo tanks

    B

    increasing the total quantity of oil to carry

    C

    reducing the quantity of water contained in oil

    D

    reducing cargo discharged time


    正确答案: C
    解析: 暂无解析

  • 第13题:

    4.Mum,my ________are too short. Will you buy me a new pair?

    A.pants

    B.glasses

    C.clothes

    D.shoes


    正确答案:A
    4.A【解析】根据“short”是短的和“a new pair"是新的一条/副/双等,排除B、C、D,故选A.

  • 第14题:

    Overcarriage is best prevented by ______.

    A.assuring heavy cargo is stowed low in the vessel

    B.checking the vessel's load line calculations carefully

    C.inspection of the hold at completion of discharge

    D.stowing the cargo which is to be discharged last on the bottom


    正确答案:C

  • 第15题:

    请打开货灯。()

    • A、Please turn on cargo lights.
    • B、Please fix cargo lights.
    • C、Please turn on hatch lights.
    • D、Please fix hold lights.

    正确答案:A

  • 第16题:

    英译中:I’ve come to repair the facilities in the bathroom. Can you please tell me what the problem is, please?


    正确答案:我来维修卫生间的设施,请您详细地告诉我什么坏了,好吗?

  • 第17题:

    cargo runner()

    • A、起货绞车
    • B、吊货钢丝
    • C、锚链舱
    • D、锚机

    正确答案:B

  • 第18题:

    请立刻把它修理一下。()

    • A、Please clean it at once.
    • B、Please repair it at once.
    • C、Please painting it at once.
    • D、Please adjust it at once.

    正确答案:B

  • 第19题:

    Liquid bulk cargo is loaded and discharged by ()(泵).

    • A、pipes
    • B、tubes
    • C、buckets
    • D、pumps

    正确答案:D

  • 第20题:

    This cargo light is not ()enough. Please change it for a new one.

    • A、light
    • B、bright
    • C、tight
    • D、dark

    正确答案:B

  • 第21题:

    单选题
    A SYSTEM OF CLEANING THE TANKS BY WASHING THEM WITH THE CARGO OF CRUDE OIL WHILE IT IS BEING DISCHARGED is known as().
    A

    COW

    B

    LOT

    C

    CBT

    D

    coferdam


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    cargo runner()
    A

    起货绞车

    B

    吊货钢丝

    C

    锚链舱

    D

    锚机


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    This cargo runner is too short. Please ()it for a long one.
    A

    charge

    B

    change

    C

    discharge

    D

    repair


    正确答案: D
    解析: 暂无解析