The ship needs loading and discharging.()A、船舶需要装货B、船舶需要卸货C、船舶需要装卸货D、船舶需要靠港

题目

The ship needs loading and discharging.()

  • A、船舶需要装货
  • B、船舶需要卸货
  • C、船舶需要装卸货
  • D、船舶需要靠港

相似考题
更多“The ship needs loading and disch”相关问题
  • 第1题:

    In most cases,the mere reception or dumping down of the cargo on the ship ______ involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.

    A.is not

    B.has not

    C.do not

    D.does not


    正确答案:D

  • 第2题:

    When do sailors make the ship fast? ()

    • A、When a ship is unmooring.
    • B、After a ship is in position alongside a wharf.
    • C、Before a ship is loading.
    • D、A and C

    正确答案:B

  • 第3题:

    船舶需要装卸货。()

    • A、The ship needs loading.
    • B、The ship needs discharging.
    • C、The ship needs unloading.
    • D、The ship needs loading and discharging.

    正确答案:D

  • 第4题:

    Which narrative regarding loading software is incorrect?()

    • A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet
    • B、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship
    • C、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test
    • D、A Loading Program may be provided as a classification requirement or as an Owner’s option

    正确答案:A

  • 第5题:

    单选题
    The port clearance for a ship should be granted()the completion of loading or discharging in the port.
    A

    before

    B

    when

    C

    after

    D

    during


    正确答案: D
    解析: 暂无解析

  • 第6题:

    单选题
    My ship is()No.5 berth for loading.
    A

    onto the wharf

    B

    moved astern

    C

    into the dock

    D

    moored alongside


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    The ship will be responsible for the cargo loaded or unloaded().
    A

    only when the cargo is within its rail

    B

    during the time when loading or ynloading is going on

    C

    after the cargo is checked by tallymen

    D

    as soon as loading or discharging begins


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
    A

    in the loading place

    B

    in the port or dock

    C

    in the loading spot

    D

    in the discharging spot


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    The ship needs loading and discharging.()
    A

    船舶需要装货

    B

    船舶需要卸货

    C

    船舶需要装卸货

    D

    船舶需要靠港


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    When do sailors make the ship fast? ()
    A

    When a ship is unmooring.

    B

    After a ship is in position alongside a wharf.

    C

    Before a ship is loading.

    D

    A and C


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    Structural stress levels in a ship are the sum of loading stresses and stresses due to().
    A

    environmental loads

    B

    variable loads

    C

    ballast loading

    D

    mooring loads


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    Which narrative regarding loading software is incorrect?()
    A

    The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet

    B

    A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship

    C

    Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test

    D

    A Loading Program may be provided as a classification requirement or as an Owner’s option


    正确答案: C
    解析: 暂无解析

  • 第13题:

    During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.

    A.ship owner

    B.ship’s officers

    C.Consignors

    D.shippers


    正确答案:B
    在装卸货期间,理货员应该和值班驾驶员联络一边及时解决问题。

  • 第14题:

    The ()is pumped onto the ship at the loading port by shore pumps.

    • A、oil
    • B、gas
    • C、water and fuel
    • D、timber

    正确答案:A

  • 第15题:

    The oil is usually pumped into ship at the loading port by().

    • A、ship’s own pumps
    • B、shore pumps
    • C、large pipes
    • D、large tubes

    正确答案:B

  • 第16题:

    单选题
    In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
    A

    is not

    B

    has not

    C

    do not

    D

    does not


    正确答案: A
    解析: 暂无解析

  • 第17题:

    单选题
    Our ship()loading yesterday morning.
    A

    finish

    B

    finishing

    C

    finished

    D

    has finished


    正确答案: C
    解析: 暂无解析

  • 第18题:

    单选题
    When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine to be().
    A

    overspeed;overload

    B

    overload;overspeed

    C

    over mechanical load;over thermal load

    D

    over torque;overspeed


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    The oil is usually pumped into ship at the loading port by().
    A

    ship’s own pumps

    B

    shore pumps

    C

    large pipes

    D

    large tubes


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    When off loading garbage to another ship, your records must identify that ship by name and ()
    A

    home port

    B

    operators name of record

    C

    official number

    D

    masters name


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
    A

    apply

    B

    comply

    C

    supply

    D

    reply


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    船舶需要装卸货。()
    A

    The ship needs loading.

    B

    The ship needs discharging.

    C

    The ship needs unloading.

    D

    The ship needs loading and discharging.


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    The loading of the ship must be done in accordance with().
    A

    the ship’s instructions

    B

    the terminal’s instructions

    C

    the port captain’s instructions

    D

    the charterer’s instructions


    正确答案: C
    解析: 暂无解析