The ship needs loading and discharging.()
第1题:
In most cases,the mere reception or dumping down of the cargo on the ship ______ involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
A.is not
B.has not
C.do not
D.does not
第2题:
When do sailors make the ship fast? ()
第3题:
船舶需要装卸货。()
第4题:
Which narrative regarding loading software is incorrect?()
第5题:
before
when
after
during
第6题:
onto the wharf
moved astern
into the dock
moored alongside
第7题:
only when the cargo is within its rail
during the time when loading or ynloading is going on
after the cargo is checked by tallymen
as soon as loading or discharging begins
第8题:
in the loading place
in the port or dock
in the loading spot
in the discharging spot
第9题:
船舶需要装货
船舶需要卸货
船舶需要装卸货
船舶需要靠港
第10题:
When a ship is unmooring.
After a ship is in position alongside a wharf.
Before a ship is loading.
A and C
第11题:
environmental loads
variable loads
ballast loading
mooring loads
第12题:
The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet
A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship
Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test
A Loading Program may be provided as a classification requirement or as an Owner’s option
第13题:
During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.
A.ship owner
B.ship’s officers
C.Consignors
D.shippers
第14题:
The ()is pumped onto the ship at the loading port by shore pumps.
第15题:
The oil is usually pumped into ship at the loading port by().
第16题:
is not
has not
do not
does not
第17题:
finish
finishing
finished
has finished
第18题:
overspeed;overload
overload;overspeed
over mechanical load;over thermal load
over torque;overspeed
第19题:
ship’s own pumps
shore pumps
large pipes
large tubes
第20题:
home port
operators name of record
official number
masters name
第21题:
apply
comply
supply
reply
第22题:
The ship needs loading.
The ship needs discharging.
The ship needs unloading.
The ship needs loading and discharging.
第23题:
the ship’s instructions
the terminal’s instructions
the port captain’s instructions
the charterer’s instructions