5 Astrodome Sports Ltd was formed in December 2000 by seven engineers who comprise the board of directors of the
company. The seven engineers previously worked together for ‘Telstar’, a satellite navigation company.
In conjunction with one of the three largest construction companies within their country they constructed the ‘365
Sports Complex’ which has a roof that opens and uses revolutionary satellite technology to maintain grass surfaces
within the complex. The complex facilities, which are available for use on each day of the year, include two tennis
courts, a cricket pitch, an equestrian centre and six bowling greens. The tennis courts and cricket pitch are suitable
for use as venues for national competitions. The equestrian centre offers horse-riding lessons to the general public and
is also a suitable venue for show-jumping competitions. The equestrian centre and bowling greens have increased in
popularity as a consequence of regular television coverage of equestrian and bowling events.
In spite of the high standard of the grass surfaces within the sports complex, the directors are concerned by reduced
profit levels as a consequence of both falling revenues and increasing costs. The area in which the ‘365 Sports
Complex’ is located has high unemployment but is served by all public transport services.
The directors of Astrodome Sports Ltd have different views about the course of action that should be taken to provide
a strategy for the future improvement in the performance of the complex. Each director’s view is based on his/her
individual perception as to the interpretation of the information contained in the performance measurement system of
the complex. These are as follows:
Director
(a) ‘There is no point whatsoever in encouraging staff to focus on interaction with customers in efforts to create a
‘user friendly’ environment. What we need is to maintain the quality of our grass surfaces at all costs since that
is the distinguishing feature of our business.’
(b) ‘Buy more equipment which can be hired out to users of our facilities. This will improve our utilisation ratios
which will lead to increased profits.’
(c) ‘We should focus our attention on maximising the opening hours of our facilities. Everything else will take care
of itself.’
(d) ‘Recent analysis of customer feedback forms indicates that most of our customers are satisfied with the facilities.
In fact, the only complaints are from three customers – the LCA University which uses the cricket pitch for
matches, the National Youth Training Academy which held training sessions on the tennis courts, and a local
bowling team.’
(e) ‘We should reduce the buildings maintenance budget by 25% and spend the money on increased advertising of
our facilities which will surely attract more customers.’
(f) ‘We should hold back on our efforts to overcome the shortage of bowling equipment for hire. Recent rumours are
that the National Bowling Association is likely to offer large financial grants next year to sports complexes who
can show they have a demand for the sport but have deficiencies in availability of equipment.’
(g) ‘Why change our performance management system? Our current areas of focus provide us with all the
information we need to ensure that we remain a profitable and effective business.’
As management accountant of Astrodome Sports Ltd you have recently read an article which discussed the following
performance measurement problems:
(i) Tunnel vision
(ii) Sub-optimisation
(iii) Misinterpretation
(iv) Myopia
(v) Measure fixation
(vi) Misrepresentation
(vii) Gaming
(viii) Ossification.
Required:
(a) Explain FOUR of the above-mentioned performance measurement problems (i-viii) and discuss which of the
views of the directors (a-g) illustrate its application in each case. (12 marks)
第1题:
此题为判断题(对,错)。
第2题:
3 Moffat Ltd, which commenced trading on 1 December 2002, supplies and fits tyres and exhaust pipes and services
motor vehicles at thirty locations. The directors and middle management are based at the Head Office of Moffat Ltd.
Each location has a manager who is responsible for day-to-day operations and is supported by an administrative
assistant. All other staff at each location are involved in fitting and servicing operations.
The directors of Moffat Ltd are currently preparing a financial evaluation of an investment of £2 million in a new IT
system for submission to its bank. They are concerned that sub-optimal decisions are being made because the current
system does not provide appropriate information throughout the organisation. They are also aware that not all of the
benefits from the proposed investment will be quantitative in nature.
Required:
(a) Explain the characteristics of THREE types of information required to assist in decision-making at different
levels of management and on differing timescales within Moffat Ltd, providing TWO examples of information
that would be appropriate to each level. (10 marks)
第3题:
Smoking is so harmful to personal health that it killing ( ) people each year than automobile accidents.
A、seven more times
B、seven times more
C、over seven times
D、seven times
第4题:
I first met Lisa three years ago when we ________ at a radio station together.
A.have worked B.had been working C.were working D.had worked
第5题:
The Chief and 3rd Engineers went below,changed the fuel to diesel oil and reduced the engine to slow ahead.This sentence implies all those below except that ________ .
A.the Engine was not on slow ahead before Chief and 3rd Engineers went down
B.the Engine was using diesel oil before Chief and 3rd Engineers went down
C.the Engine was using fuel oil before Chief and 3rd Engineers went down
D.the Chief and 3rd Engineers went into the Engine Room to operate the Engine
第6题:
第7题:
第8题:
Seven short blasts continued for one minute means ().
第9题:
You are the network administrator for The network consists of a single Active Directory domain named All servers run Windows Server 2003. All client computers run Windows XP Professional. You are required to accommodate for five new support engineers. The five support engineers will have have the following responsibilities: 1. Stop and start printers, clear print jobs from the printer queues, and set permissions on printers. 2. Back up and restore all files on the servers. 3. Make changes to TCP/IP settings. 4. Create and delete shared resources You need to assign the support engineers the appropriate permissions to perform the required tasks on the 20 member servers. Of which group should you makie the Support Engineers group a member?()
第10题:
NBD callback from specialized engineers during regular business hours
support for every Cisco product
support for low-end products only
cases opened via e-mail or telephone at any time
advanced replacement on the next business day
immediate support from the Cisco TAC engineers
第11题:
made
for
what
in use
第12题:
While a fix can be generated by signals received from two satellites,three satellites are necessary for reliable accuracy
The satellites are in equatorial orbits around the earth about 60°of longitude apart
The satellite navigation system determines a fix by measuring the doppler shift of the radio signals from the satellite
The ship's receiver cannot begin processing data until the antenna locks onto the satellite and starts continuous tracking
第13题:
5 The directors of Quapaw, a limited liability company, are reviewing the company’s draft financial statements for the
year ended 31 December 2004.
The following material matters are under discussion:
(a) During the year the company has begun selling a product with a one-year warranty under which manufacturing
defects are remedied without charge. Some claims have already arisen under the warranty. (2 marks)
Required:
Advise the directors on the correct treatment of these matters, stating the relevant accounting standard which
justifies your answer in each case.
NOTE: The mark allocation is shown against each of the three matters
第14题:
(b) Identify and explain THREE approaches that the directors of Moffat Ltd might apply in assessing the
QUALITATIVE benefits of the proposed investment in a new IT system. (6 marks)
第15题:
MONTHLY MEETING MINUTES OF BOARD OF DIRECTORS Time: 2:30 p.m., March 5, 2015 Place: Conference room, second floor of 3T Co. Ltd. Participants: All the directors Chairman: Chairman of the board, Mr. William Forest Minutes keeper: Linda The main activities at the meeting are as follows: Firstly, Mr. William Forest, chairman of the board, made a report on the work and total sales of the company this season. Then the report was followed by a heated discussion. Secondly, all the directors agreed to hold a press conference for the company next month. Thirdly, the meeting suggested inviting experts from Canada to give a five-day training course to staff in the Sales Department. The meeting finished at 3:30 p.m.
1. Who are the meeting participants().
A. The executive assistants.
B. The directors.
C. The interviewees.
2. How many activities does the meeting have().
A. The executive assistants.
B. The directors.
C. The interviewees.
3. Mr. William Forest made a report ()this season.
A. on training course to staff in the Sales Department
B. on the advertisement policies of the company
C. on the work and total sales of the company
4. What did all the directors agree to do ()
A. To carry out a training project in the company next year.
B. To have another board meeting of all directors next season.
C. Tohave a press conference for the company next month.
5. How long did the meeting last ()
A.1.5 hours.
B.1 hour.
C.2 hour.
第16题:
The fact that "almost one-fourth of engineers in America who earned Ph.D. s are foreign born" implies that( )
[A] the majority of American people are not interested in getting Ph.D.
[B]foreign students are more eager to get Ph. D.
[C] the American education has lagged behind in the New Economy
[D]American students are not as clever as foreign students
第17题:
第18题:
第19题:
第20题:
Which three are components of the Cisco SMARTnet service? ()
第21题:
(As it is now)
Maelle and Gerard, both engineers, are competent, loving parents.
Maelle and Gerard are both competent, both loving parents, both engineers.
Maelle and Gerard are both: competent, loving parents, engineers.
Maelle and Gerard are both loving and competent parents and engineers.
第22题:
Rescue workers
GPS users
European drivers
第23题:
the Administrators local group on one of the domain controllers.
the Administrators local group on each of the servers.
the Server Operators local group on one of the domain controllers.
the Power Users local group on one of the servers.
the Backup Operators local group on one of the domain controllers.
the Backup Operators local group on each of the servers.